AS9100 & ISO 9001 Alignment

Zero non-conformance dispatch standards for critical mechanical parts

Every component produced at our Epping facility undergoes strict tolerance verification and comprehensive metallurgical logging prior to release.

100%

material traceability

CMM

verified reporting

AS/NZS

standard adherence

Inspection Policy

Every dimension is verified, logged, and backed by calibration certificates.

Mandatory Controls

Three rigorous inspection points

01
02
03

Raw stock testing

In-process CMM logging

Final packaging audit

Primary Australian mill test certificates verified against incoming material specifications before cutting.

Coordinate Measuring Machine verification reporting executed throughout machining operations.

Batch documentation compiled and checked against drawing tolerances prior to dispatch.

Examine our inspection sheets

Request QA sample packages and template documentation for your engineering file.